Jaipur . Bhaskar A Sawant, Principal Secretary to the Public Health Engineering Department, said that the proposal for the summer season 2025 should be submitted by January 5. He said that cutting of illegal water connections in the state should be expedited and effective action should be taken against the concerned culprits. He said that if the law and order situation deteriorates while disconnecting illegal water connections, then it should be informed at the higher level so that the police can be informed at the higher level to take strict action.
Sawant, while addressing the Chief Engineer, Additional Chief Engineer, Superintending Engineer, including the Executive Engineers through video conference from Jal Bhawan, said that all the operation and maintenance works like repair of pump motor, pipeline, electric item, panel and head pump including water schemes. Tenders for the rate contracts of K&M which are going to be completed in the coming time should be invited by 31st December under all circumstances. Any kind of negligence in this will not be tolerated. Will not be done. He instructed all the superintending engineers to assess the demand of the goods from the block office and send them to the online module of MM Cell by December 31. The Principal Secretary to the Government said that all the superintending engineers should identify 10 such places in their respective areas. Where there are often problems of drinking water in the summer season, so that these problems can be solved in time in the coming summer season. He said that by identifying the areas where drinking water is to be transported through tankers, it should be ensured that the proposals are sent by January 5 under all circumstances.